Step 1
Contact us to discuss your requirements – we will discuss your current energy usage, systems, and tariffs, budget, timescales, and any low-carbon goals.
We help homeowners and commercial organisations apply to and notify local energy distribution networks (District Network Operators or DNOs) for the connection of solar panels or other renewable energy sources to the National Grid.
For small-scale microgeneration systems, e.g. most domestic solar PV systems up to 16amps or 3.68kW per phase, a ‘connect and notify’ process is required, as per the Engineering Recommendation standard (EREC) G98. The DNO must be notified within 28 days of installation.
For larger generation schemes i.e. with an output greater than 3.68kW, a more complex G99 application for DNO approval is required, with site plans etc. Depending on the specification, approval can take between 10-45 working days.
DNO notification and approval ensures that local networks can safely accommodate the additional power. Our experienced team can assist with both G98 notifications and G99 applications to ensure your project progresses as planned- contact hello@bartonknightenergy.co.uk to find out more.
Contact us to discuss your requirements – we will discuss your current energy usage, systems, and tariffs, budget, timescales, and any low-carbon goals.
If you are interested in purchasing a renewable energy system from Barton Knight, we will visit your property to assess its suitability for various options – size, access, age, insulation, number of/proximity to other properties, and your existing systems will all influence our recommendation. We will also advise and assist with any relevant applications for government grant funding or to eg UK Power Networks/National Grid if required.
Depending on the system you have chosen, we will advise on any preparation for the day of installation required – typically this is minimal.
Once the system has been installed and tested, we will walk you through the controls and give you a thorough handover, along with all operating and maintenance and warranty documents.
Book a review with our energy consultants
Barton Knight Energy is committed to the highest standards of quality, safety and compliance across all our projects.
As an NICEIC Approved Contractor, we are regulated by the UK’s leading voluntary register of electrical businesses, with our work independently assessed against rigorous technical standards. We are also a Constructionline Gold accredited contractor, meeting enhanced PAS 91 requirements and validated as ‘Deemed to Satisfy’ under SSIP, including compliance with the Common Assessment Standard (CAS).
Our membership of the Electrical Contractors Association, and Safe Contractor Approval further demonstrates our commitment to safe, ethical and financially robust operations.
In addition, we hold a range of specialist renewable energy accreditations. These include MCS certification for small-scale technologies such as solar PV, battery storage and heat pumps, as well as membership of the Renewable Energy Consumer Code (RECC). We are also proud to be a Trusted Partner of Octopus Energy, reflecting our expertise in delivering high-quality, future-focused energy solutions.